New Locker rooms, rehab & training, etc. That excavated hole in front of Maples dug and new underground-level concrete construction poured & cured, including former lawn-level concrete roofing. How much longer? Will it be open for a inaugural celebration fan/donor tour/viewing when complete? Will a lawn be reinstalled between Maple & Campus Dr, or some kind of paver patio atop the expansion roof?.